Overall Package Projects of Century Interconnect Xiangshan Phase I, II, III, and IV

Release time:2024.03.06 06:50

The Overall Package Projects of Century Interconnect Xiangshan Phase I, II, III, and IV are located in Beijing, with a total construction area of approximately 23,000 square meters. The construction includes underground two-level cold storage, a lobby area on the first floor, power distribution levels on the 2nd and 6th floors, and data center floors on the 3rd, 4th, 5th, 7th, 8th, and 9th floors, as well as rooftop diesel generators and cooling tower areas. From the inception of the Phase I project in 2019, marking the company's new chapter in data center development, to the continuous progress of the Phase II project in 2020, and finally to the completion of the acceptance of the Phase III and Phase IV projects in 2022, the completion of the Xiangshan project has drawn a perfect conclusion for Century Interconnect Xiangshan.